2018
Wiener Linien Vienna, Austria

The information center U2/U5 in the future U5 station “Volkstheater” was opened at the end of 2018. On an area of more than 700 m², an interactive and multimedia exhibition has been created to give an overview on everything related to the planning, construction and operation of the new subway routes. The replica of a tunnel boring machine and the 1 : 1 platform model of a U5 station in the new design are a special highlight of the exhibition. Visitors are invited to explore information by themselves, to plan future subway routes, or to operate a tunnel boring machine at the interactive stations.

Project Requirements

  • Seamless floor coating on different, sometimes problematic substrates
  • Noise reduction
  • Individual color design (according to NCS code)
  • VOC-free
  • Easy to clean

Sika Solutions

  • Two-component primer
  • Solvent-free, elastic, self-leveling polyurethane base layer, which works also as acoustic insulation
  • Colored, non-yellowing top coat

Products Used

Sika ComfortFloor® P S-63 system composed of:

Sikafloor®-161
Sikafloor®-320
Sikafloor®-330
Sikafloor®-305 W

Project Participants

Owner: Wiener Linien GmbH & Co KG

Specifier: Planet Architects ZT Gmb

Applicators
: Mabeko Malen – Beschichten — Korrosionsschutz GmbH, MST Muhr-Sanierungstechnik GmbH